Hilton Hotel in Minsk

  • Completion date
    July 2022
  • Project type
    Waterproofing

The waterproofing work was carried out at a depth of 12 meters below ground level in close proximity to the Svisloch river with constant dewatering. The ground water level is 3-4 meters above the bottom of the foundation.

The customer set the task to perform vertical waterproofing for the entire height of the foundation with an adjoining device to the horizontal bitumen roll waterproofing. A solution with Remmers MB 2K sprayed reactive waterproofing was used, which made it possible to provide the necessary level of protection under high water loads and ensure a tight adjoining to the horizontal waterproofing.

Work completed

Sprayed waterproofing systems

Mechanized application and rapid polymerization significantly reduced the time of work, which, in turn, reduced the cost of dewatering.

Construction and sealing of expansion joints

The expansion joint sealing system included two levels of protection: filling the joint chamber with acrylate gel and sealing with elastic waterproofing tapes.

Sealing of utility inputs

Stopaq polyurethane sealant was used for sealing, followed by MB 2K on the surface of pipes and cables.